Want to know quickly if your process cooling system is:
Consistently cooling ✅
Has the proper flow ✅
Is not overheating ✅
You might think your process cooling system is fine, but it’s possible that it could be better. As process cooling technology is becoming more energy efficient, and because we have over 100 years of experience, we have found that we can improve most of the process cooling systems that we assess.
Energy Consumption of Chillers
#chillerCHECK can be carried out without any disruption to your production, in as little as 10 minutes.
Our engineer makes a visual inspection of your entire process cooling system, from chiller to ancillary equipment. Equipment is checked for condition, appropriate capacity, ISO compliance, appropriate flow and leaks, to name but a few areas.
After we have #chillerCHECKED your system, you will receive a no-obligation written report, outlining where running efficiency improvements or energy savings could be made, and highlighting any non-conformance with ISO standards or wasteful practices.
Making even small changes as a result of the free assessment can be enough to offer long-term financial savings and decrease your production costs.
Did you know?
Free cooling has the potential to reduce your chiller electricity consumption by as much as 50%.
Helping you with ISO compliance
Atlas Copco has ISO 9001, ISO14001, OHSAS18001 and ISO 50001 compliance. We can make recommendations to other companies to help continually reduce your energy use, energy costs and greenhouse gas emissions, and advise on legal requirements and reporting, to assist in your ISO compliance too.