From pressure testing to drying and cleaning

Are you starting a new project that requires a pipeline system? Pipeline commissioning is an essential process to ensure everything runs smoothly. This process includes cleaning, pressure testing, drying, cleaning and checking the system is safe and ready to use. Whether it’s for oil, gas or water, proper commissioning helps prevent problems and ensures your pipelines performs reliably from the beginning.
 

What is pipeline commissioning?

Pipeline commissioning is the process of ensuring that a newly constructed or modified pipeline system is ready for operation. This includes testing, checking, and confirming that the pipeline and its equipment are working correctly and meet safety, operational and environmental standards. The goal is to ensure the pipeline can safely transport its product, like oil, gas, or water, without leaks or other operational issues.

Why is pipeline commissioning important?

Newly installed pipelines often contain impurities like grease, dirt, debris, oil, and vapor, which can cause contamination, disrupt operations, and even lead to accidents. For example, if hydrocarbons mix with oxygen, they can cause explosions, and leaks can result in serious environmental damage or fires. The commissioning process helps eliminate these hazards by thoroughly cleaning and clearing the pipeline of contaminants. This improves the pipeline’s safety, reliability, and efficiency, while also extending its lifespan. 

How to start with commissioning a pipeline?

The commissioning process begins once pre-commissioning is completed and the pipeline is safely set up. This phase involves critical tasks such as:
 

  • Cleaning and flushing: removing debris, dust or leftover construction materials from within the pipeline. This is often achieved through pigging, where a PIG is sent through the pipeline to clean it and clear out any remaining impurities.

  • Pressure testing: applying pressure to detect leakages and ensure the system can withstand operational pressures.

  • Conditioning: after pressure testing, pipelines are conditioned with dry air or nitrogen to prevent corrosion or contamination.


After these steps, the commissioning phase starts, where the pipeline is filled with the product and adjusted to the required pressure and temperature. Key tasks during this stage include:
 

  • Checking instrumentation and control systems: ensuring that valves, sensors and control mechanisms work as intended.

  • Operational testing: running the pipeline to test its ability to safely and efficiently transport the product over the desired distances.


In the post-commissioning phase, the pipeline is closely monitored and fine-tuned for optimal performance.

How long does pipeline commissioning take?

The duration of pipeline commissioning can vary depending on factors such as the length and complexity of the pipeline, the type of product it will transport, and the environmental and safety regulations involved.

Personalized pipeline solutions

No matter the length, complexity or specific requirements of your pipeline. At Atlas Copco Specialty Rental we have the specialized equipment to meet your personalized pipeline commissioning requirements.

The right expertise

With extensive experience in air solutions, Atlas Copco Rental knows the ropes. We do not just provide a machine; we think along with you and make sure you receive a made-to-measure solution to get the job done.

24/7 emergency support

Breakdowns never announce themselves, that is why we are standing by around the clock. We get your operations up and running in no time. Contact us today!

Complete Solution

Atlas Copco Rental goes beyond being a simple compressor supplier; we are your comprehensive solutions partner for pipeline commissioning. In addition to our reliable air compressors, we provide power generators and high-purity nitrogen units, ensuring all essential equipment is available for your commissioning process to be both safe and efficient.
 

For example, when dealing with potentially hazardous gases like H₂S or methane in pipelines, compressed air can present explosion risks. In such scenarios, nitrogen offers a safer alternative. Whether you need nitrogen for purging, leak testing, or power generation on-site, Atlas Copco Rental delivers fully integrated solutions customized to meet your project’s unique needs.
 

Learn how Atlas Copco Specialty Rental realized the Trans Adriatic Pipeline (TAP), a project that transports Caspian natural gas to Europe

Loading

  • Previous
  • 1
  • Next

Contact us today for your pipeline projects