View all our industries

Our industries

Time to calibrate?

Secure your quality and reduce defects through Tool Calibration and Accredited Quality Assurance Calibration.​
power tool calibration, tool testing, metrology, machine capability test

Momentum Talks

Discover inspirational and engaging talks on Atlas Copco
Momentum Talks
Close

Securing projects at multiple plants with a standard solution

1 minute(s) to read

International integrator with projects to one of the largest automotive companies in the world.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Velit in sit scelerisque semper curabitur. Sagittis, quam dignissim dolor cursus sem eleifend id. Vitae amet sit in est diam suspendisse quam viverra neque. Commodo sit felis mi magna nibh ullamcorper turpis.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Velit in sit scelerisque semper curabitur. Sagittis, quam dignissim dolor cursus sem eleifend id. Vitae amet sit in est diam suspendisse quam viverra neque. Commodo sit felis mi magna nibh ullamcorper turpis.

Sagittis,quam dignissim dolor cursus sem eleifend id. Vitae amet sit in est diam suspendisse quam viverra neque. Commodo sit felis mi magna nibh ullamcorper turpis.

CHALLENGE
CHALLENGE
The integrator had won a project for a new, major transmission assembly plant. While they had a custom error proofing solution for many of the stations, it was not approved by the customer and needed additional engineering development. They did not have the engineering resources available for this customization, thus project delivery timing was in jeopardy.
 
The integrator had won a project for a new, major transmission assembly plant. While they had a custom error proofing solution for many of the stations, it was not approved by the customer and needed additional engineering development. They did not have the engineering resources available for this customization, thus project delivery timing was in jeopardy.
SOLUTION
SOLUTION
The integrator, Atlas Copco and the end user worked together to validate station requirements, including traceability and in-process verification.
 
The integrator, Atlas Copco and the end user worked together to validate station requirements, including traceability and in-process verification.
IMPACT
IMPACT
After successful delivery, similar projects for four additional plants with the same customer followed. Download the case study for more information.
 
After successful delivery, similar projects for four additional plants with the same customer followed. Download the case study for more information.
ADDITIONAL PROJECTS

+4 PLANTS
ADDITIONAL PROJECTS

+4 PLANTS
 
Download case study
Download case study
Click for more information
 
Click for more information
  • Automotive