Atlas Copco Rental delivers equipment in complex phases of pipeline project
Pipeline project for Surerus Pipeline, Inc. and J. Murphy & Sons Ltd. Of London, located in British Columbia, Canada
Are you starting a new project that requires a pipeline system? Pipeline commissioning is an essential process to ensure everything runs smoothly. This process includes cleaning, pressure testing, drying, cleaning and checking the system is safe and ready to use. Whether it’s for oil, gas or water, proper commissioning helps prevent problems and ensures your pipelines performs reliably from the beginning.
Pipeline commissioning is the process of ensuring that a newly constructed or modified pipeline system is ready for operation. This includes testing, checking, and confirming that the pipeline and its equipment are working correctly and meet safety, operational and environmental standards. The goal is to ensure the pipeline can safely transport its product, like oil, gas, or water, without leaks or other operational issues.
Newly installed pipelines often contain impurities like grease, dirt, debris, oil, and vapor, which can cause contamination, disrupt operations, and even lead to accidents. For example, if hydrocarbons mix with oxygen, they can cause explosions, and leaks can result in serious environmental damage or fires. The commissioning process helps eliminate these hazards by thoroughly cleaning and clearing the pipeline of contaminants. This improves the pipeline’s safety, reliability, and efficiency, while also extending its lifespan.
The commissioning process begins once pre-commissioning is completed and the pipeline is safely set up. This phase involves critical tasks such as:
After these steps, the commissioning phase starts, where the pipeline is filled with the product and adjusted to the required pressure and temperature. Key tasks during this stage include:
In the post-commissioning phase, the pipeline is closely monitored and fine-tuned for optimal performance.
The duration of pipeline commissioning can vary depending on factors such as the length and complexity of the pipeline, the type of product it will transport, and the environmental and safety regulations involved.
Atlas Copco Rental goes beyond being a simple compressor supplier; we are your comprehensive solutions partner for pipeline commissioning. In addition to our reliable air compressors, we provide power generators and high-purity nitrogen units, ensuring all essential equipment is available for your commissioning process to be both safe and efficient.
For example, when dealing with potentially hazardous gases like H₂S or methane in pipelines, compressed air can present explosion risks. In such scenarios, nitrogen offers a safer alternative. Whether you need nitrogen for purging, leak testing, or power generation on-site, Atlas Copco Rental delivers fully integrated solutions customized to meet your project’s unique needs.
Loading
Pipeline project for Surerus Pipeline, Inc. and J. Murphy & Sons Ltd. Of London, located in British Columbia, Canada
Pipeline construction projects include new and expansion plans to mainly transport oil, natural gas and LNG.